Professional experience
|
Sept2013-Nov2013
WAVSYS Irvine, CA
Ericsson
FSO
Ericsson
UMTS 3106, 3206, 3418, 3518 UMTS 2nd carrier add installation and
integration, RAX/TRX board installation for T-Mobile. HS-1
Certified. Upgrade CDMA/BTS (Ericsson/Nortel) equipment and ready for LTE
(Ericsson) for Verizon Wireless. Installed and commissioned DOM-A,
eDCG, MFRM1,2,&3. Ran RF jumpers, T-1 cables, Fibers, and power
Feb2013-July2013
TEKsystems Irvine, CA
Field
Technician III Operations & Maintenance for T-Mobile servicing Ericsson
UMTS, LTE, GSM for 2G, 3G, 4G and LTE technologies in Orange County, CA.
Dec2012-Feb2013
Orin USA Chicago, IL, WA, Michigan,
Wisconsin, Idaho
Ericsson CDMA Metro Cell and Compact Metro Cell
Outdoor EV-DO
DOM-A Replacement with AEM 1302 Module. Commissioned/Programmed and
installed each AEM 1302 Module per site. Reprogram CSR 7705, ran scripts
for AEM 1302 for each site. Verizon Wireless.
July2012-Nov2012
Scarlet Wireless
Los Angeles, CA
Field
team leader. Installed RBS 6102 for T-Mobile Modernization uninstalled
RBS2106. Uninstalled previous jumpers, T1's, groundings, LMU cables.
Installed cabinet base adapter and mounted new RBS 6102 cabinet. Replace
new jumpers to the 3 sectors of GSM, LTE & PCS. Conducted sweep test.
Installed back up batteries. Power up the cabinet. Commissioning &
integration of DUW-30 and DUG. 2g & 3g test calls.
April2011-July2012
Pride Communication (Ericsson FSO)
Irvine, CA Training T-Mobile Modernization. Rip and Replaced
RBS2106 to RBS 6102 cabinet, Rip and Replaced RF jumpers, Relocate LMU
Integrate DUW-30 and DUG. DUW-30 upgrade on UMTS equipment,
Provisioning of 7705 Router for T-Mobile. Lead for Ericsson LTE
installation and integration and 2nd carrier add for Metro PCS
for the Los Angeles market, San Francisco market. Ericsson UMTS 3106, 3206,
3418, 3518 UMTS 2nd carrier add installation and integration, RAX/TRX
board installation for T-Mobile. HS-1 Certified. Upgrade CDMA/BTS
(Ericsson/Nortel) equipment and ready for LTE (Ericsson) for Verizon
Wireless. Installed and commissioned DOM-A, eDCG, MFRM1,2,&3. Ran
RF jumpers, T-1 cables, Fibers, and power. In the Los Angeles, Orange
County, San Diego, and San Bernardino Verizon Wireless markets.
Jan2010-April2011
Zero Chaos (Ericsson FSO)
Los Angeles, CA
Training
for Ericsson LTE installation and integration and 2nd carrier add for Metro
PCS. UMTS 2nd
carrier add installation and integration, RAX/TRX board installation
for T-Mobile. HS-1 Certified. Upgrade CDMA/BTS (Ericsson/Nortel)
equipment and ready for LTE (Ericsson) for Verizon Wireless.
Installed and commissioned DOM-A, eDCG, MFRM1,2,&3. Ran RF jumpers, T-1
cables, Fibers, and power. In the Los Angeles, Orange County, San Diego,
and San Bernardino Verizon Wireless markets.
April2009-Nov2009
TEKsystems
Thousand
Oaks,
CA
Install network ports Communications for NMCI at Naval Air Weapons
Station in China Lake, CA. Complete design and location of
installation and termination of fiber and CAT-5 in new and old buildings
uses of man lifts, punch down, fiber splice, test and turn up inside and
outside plant.
September
2008
TEKsystems
Houston, Texas
Complete
site inspection, redesign, repair, and re-activate UMTS all
equipment for AT&T 2G and 3G network in Houston, Texas and southern
Texas areas after Hurricane “IKE”. Part of an emergency response team to
put over 600 sites back on air.
Nov2007-July2008
Networkers
MSB
Los Angeles, CA
Inspection
of UMTS installation test and turn up of antennas and 3106, 3206
equipment (Node B and LMC) for the entire T-Mobile LA North market.
Operation and Maintenance for GSM and UMTS for the Downtown and East Los
Angeles area.
Aug2007-Oct2007
Winncomm LLC
Philadelphia, PA, Las Vegas, NV
Complete
installation test and turn up of UMTS 3106 cabinets, power and CAT-5
runs for T-Mobile in the Philadelphia, PA, NJ, and New York markets.
April2007-June2007
Ajilon Communications
Las Vegas, NV
Complete
Installation, test and turn up of Nortel Access Node Ring Optera Metro 5200
series from Burbank to Pasadena California including Fiber runs,
connections and test BNC connections and test for Nortel
July2006
–
March2007
Amatel
Los Angeles, CA
RBS
Field Ops Site integration, Commissioning and testing, of BTS Ericsson UMTS,
2102, 2202, 2106, 2206, Nokia cabinets. Troubleshooting cabinets for RBS
Faults. Configuring and installing IDB using OMT software to BTS/Flash
card. Cabinets add, rip and Upgrades for the Cingular LA market and
the T-Mobile USA LA/OC market
Nov2004
–
July2006 Aster
Telesolutions
Inc.
Milpitas, CA
RBS
Field Ops/Engineering, Operations & Maintenance, Integration and
optimization of GSM mobile wireless networks for BTS equipment 2102, 2202,
2106, 2206, 2308 Installation of Paragon for T-1 lines. Troubleshooting
cabinets for RBS Faults. Configuring and installing IDB using OMT software
to BTS/Flash card. Cabinets add, microwave, rip and introduction to UMTS
3106 installation upgrades for the T-Mobile USA LA/OC market
May2004
- Nov2004 Ajilon
Communications
Las Vegas, NV
Complete
Installation, test, and turn up, of FTTP, ADC High-Density Fiber
Distribution Frame, Nortel Optera Metro 5200’s, and Alcatel 7300’s. Fiber
runs, clean, check, and connects fiber jumpers / cables, for Verizon.
Nov2003 –
May2004
WFI
San Diego, CA
Site
integration, Commissioning and testing, of BTS 2102, 2202, 2106, 2206
cabinets.
Installation
of Paragon for T-1 lines. Troubleshooting cabinets for RBS Faults.
Configuring and installing IDB using OMT software to DXU. Cabinets add, rip
and Upgrades for the Cingular market.
Sept2003
– Nov2003 Expert Wireless
Solution
Vienna, VA.
Antenna
system test and measurements, reconfiguring IDB and troubleshooting.
Ericsson install and test for AT&T troubleshoot and test equipment if
site went down, ran T-1 from Demarc to the RBS, and performed punch down.
CW Drive testing uses of Grayson transmitter and Grayson receiver Recording
data for Sprint. Uses of TEMS test equipment 4.0.1 GSM Test site
Sectors and Omni antennas Drive test cluster areas record
data.
Jan2002 – Aug2002 Precision
Wireless Communications Sacramento,
CA.
Drive Tester, Uses of TEMS test equipment 3.2.2 GSM and test drive cluster
areas AT&T Wireless.
Nov1999
–
Dec2001
T-Staff
Marietta, GA.
Installer/Field
Technician B-3
Installation, test and turn-up
Nortel, Fujitsu equipment (OC-48’s, OC-192’s, Optera Metro, ect…) Ericsson
equipment, RBS-2206, 2106, and 2308 systems. Troubleshoot on all RBS 2000
equipment, checking T-1 with the switch. Install, turn up, and test
Ericsson and Nortel.
|
|
Education
Training
|
2014
University of Phoenix
Bachelors
of Science in Information Technology (in Progress)
2006
University of Phoenix
Information Technology, Electronic Engineering
1991
- 1993High Tech InstitutePhoenix, AZ
Electronic Technician
Electronic
Degree
2012 Ericsson LTE RBS 6000 Installation and
Integration ASPs
2012
Ericsson T-Mobile Multi Standard
Solution
Overview
2010
Ericsson
Richard, TX
CDMA/BTS Hardware Specialist Training HS1
2004
Racal
Irvine, CA
Training for use of Racal unit.
2004
Carrier Access
Irvine, CA
Training for Paragon
2004
Anritsu
Irvine, CA
Training for use of Anritsu Cell Master
2004
Ericsson BTS
Irvine, CA
Training on Ericsson BTS equipment
Multiple training
classes/courses courtesy of T-Mobile.
Uses of TEMS test equipment 3.2.2 GSM.
Ericsson Certified: Ericsson
GSM 2000, Ericsson 884 RBS Ericsson 882 RBS
Ericsson: UMTS
installation and integration.
Troubleshooting and sweeping antennas and
components.
Knowledge of all required tools, and computer
hardware and test equipment.
Contracted to:
T-Mobile, Cingular Wireless, Nortel, AT&T, Qwest, 360 Networks,
Williams Communication, Ericsson, Touch America, E.L.I., Eshalon
Telecommunications, Prism Telecommunications, Verizon, and Sprint.
Installed and integrated: ERICSSON- UMTS, LTE 2202, 2102,
2206, 2106, 2308, and 2250. NORTEL, OC-48, OC-192, Optera LH, Optera Metro,
3500’s, DWDM 32 Channel, DMACS, DSX-1, DSX-3, PBX, BNC connections,
populated equipment with circuit cards with proper ESD, MIS. Bays, Special
installations. CMS 40 Plants Testing & Assemble, Trouble shooting CSU’s
and NIU’s.
Installed:
Cables, 750 cable, power cables, UHF, VHF, fiber runs and connections per
spec. (blue print) power and breaker connections, power / ground splicing,
wire wrapping with color or per spec.(blue print), use of LIGHTWAVE test
equipment.
|